Surface Preparation

Automated Zinc Phosphate Pre-Treatment

JSSEPL's hot-dip pre-treatment line supports surface cleaning, activation, zinc phosphating, rinsing, passivation and dry-off before powder application.

The line combines process tanks with filtration and circulation equipment that helps maintain bath cleanliness and stable chemical performance. An oil skimmer at the KOD tank removes floating oil, while dedicated filtration supports the phosphating and major process tanks.

The documented line uses eight tanks plus one dry-off stage and follows a total pre-treatment cycle of approximately 35 minutes.

JSSEPL automated zinc phosphating pre-treatment line
Hot-dip zinc phosphate pre-treatment line at the JSSEPL powder coating facility.

Line Configuration

Technical Details

Parameter Documented Specification
Process stages 8 tanks plus 1 dry-off stage
LPG burners 4
DM water consumption 25,000 litres
Single pre-treatment burner consumption 8 kg/hour
Total pre-treatment line consumption 24 kg/hour
Pre-treatment tank size 1990 × 1250 × 1350 mm (L × W × H)
Total cycle time 35 minutes
Chemical consumption As specified in the applicable technical data sheet

Supporting Systems

Filtration and Bath Management

Press Filter Unit

Supports sludge separation and solution cleanliness in the phosphating tank.

Bag Filtration and Circulation

Installed on the KOD, degreasing, WR-3 and passivation tanks for continuous circulation and cleaning.

Oil Skimmer

Removes floating oil from the KOD tank to support cleaning performance and bath life.

Discuss Surface Preparation Requirements

Share the component material, dimensions and coating specification so the team can review the suitable preparation route.

Have a Requirement for Precision Engineering Components?

Looking for sheet metal pressed components, welded assemblies, press tools or industrial powder coating? Share your drawings, specifications or manufacturing requirements with our team for a customized solution.

Contact Us